Logo
loading...

KOALA BAY NERJA



Koala Bay Nerja


Another challenge that we face so much in a very difficult job given to the facilities that are presented to us as closed circuit television networks and lighting systems but that is not the worst but the installation time of all the systems which we have 3 weeks for its completion.


We start with a surface assembly of the perforated tray which will be housed all the facilities.


Surely everything will be perfect and soon we will see the results.